The notices disputed the claimed easement, denied that I had granted permission for the work, demanded preservation of all project records, and requested that construction on my property cease until the authorization could be verified.
Susan also sent a request for the complete engineering plans and any permits associated with the pipeline.
She advised me to avoid direct confrontation with Carla.
"If she contacts you, tell her to communicate through me," she said. "If workers return, photograph the activity from a safe distance and call the authorities if necessary. Don't physically interfere with machinery."
I agreed.
The next morning, a delivery truck arrived at the ranch carrying a large package of survey drawings.
The sender was Summit Regional Infrastructure.
Inside were several rolled plans, a technical report, and a cover letter stating that the company was providing preliminary project information in response to the property-access dispute.
I spread the drawings across the kitchen table.
Michael came over that afternoon to help me review them.
We began with the route map.
The proposed pipeline crossed my eastern pasture, continued through the valley, and approached the spring from the south. A branch line appeared to lead toward a planned storage facility near the ridge.
The drawings also showed a small pumping station.
It was located less than two hundred yards from the spring's collection basin.
Michael leaned over the map.
"That's closer than I expected."
"Can you tell what they're doing?"
"Not from this sheet alone. We need the flow diagram and the operating specifications."
We found those in the technical report.
The project was designed to collect water from a proposed intake near the spring, transport it through the new pipeline, and deliver it to a storage reservoir intended to supplement Willow Ridge's existing supply.
I read the relevant paragraph twice.
"They're taking water from the spring."
"That's what the design appears to show," Michael said.
"Without asking me."
"We need to be careful about the legal conclusions until Susan reviews the permits and water-rights documents. But the engineering plan is clearly designed to connect to a collection point near your spring."
I sat down.
For years, I had treated the spring as a reliable resource, but never as an unlimited one. Its flow changed with rainfall, snowmelt, and seasonal groundwater conditions.
In a dry year, every gallon mattered.
The ranch had enough water to support its livestock and household needs because we managed the system carefully. We monitored the collection basin, repaired leaks promptly, and adjusted irrigation when the flow weakened.
If a new pipeline began drawing water from the same source, the effects could be significant.
The spring might not be able to support both systems during the dry months.
The collection basin could be altered.
The pumping station could affect local pressure conditions.
And if the construction disturbed the natural flow path, even the existing supply could become less reliable.
I felt anger rising again, but this time it was mixed with a deep, almost physical sense of betrayal.
Carla had not simply sent workers across a pasture.
She had planned to connect a private development to a water source that my family had protected for generations.
And she had done it using a document I had never signed.
Michael turned another page.
"Look at this."
The report contained a section describing the expected annual yield of the spring.
The figures were estimates based on a limited set of measurements.
I recognized the problem immediately.
The engineers had not monitored the spring over a full seasonal cycle. They had used several observations, combined with regional groundwater estimates, to calculate the potential supply.
"That isn't enough information," I said.
Michael nodded.
"Not if they're planning to depend on it during drought conditions."
The report also included a preliminary assessment of downstream impacts.
It claimed the project was unlikely to affect existing users, provided that the intake operated within the projected flow range.
But the assessment did not include the complete historical records from my property.
It did not account for every seasonal variation documented in Evelyn's notebook.
And it did not explain how the pumping station would be managed when the spring's flow dropped below the projected level.
I called Susan.
She reviewed the relevant pages and told me to send the complete package to her office.
"These documents raise additional questions," she said. "We need to determine what water rights the association claims, what permits have been issued, and whether the proposed intake has been properly reviewed."
"Can they take the water if they have a permit?"