Martin watched the county truck pull away down Cedar Hollow Road, and then he stood for a while looking at the line of orange flags running from his well house toward Maple Ridge, bright against the grass.

Oscar Penn came back the following week with a crew of two and a meter in a padded case. He brought a flow meter that clamped around the main pipe, and a set of pressure gauges, and a roll of plans he spread on the tailgate of his truck, and he told Martin that the day's job was to measure what the line carried and to count, connection by connection, how many homes it served. Martin met him at the well house in the morning, and the two of them walked the flagged route once more, Penn checking each orange flag against his clipboard, the crew following with the meter case and a shovel. The air was mild, and the grass along the route had begun to green, and the flags stood bright against it, marking a path Martin now knew by heart.

They started at the well house, where Penn clamped the flow meter around the main pipe just past the pump, and where he recorded the well's output with the pump running. The numbers came up steady and strong, the numbers of a good well, a well drilled deep in 1964 and kept in repair for sixty years. Then they moved to the trench at the edge of Martin's land, where the crew uncovered the capped pipe end and Penn fitted a gauge to it, and where he explained, in his unhurried way, that a capped main still told a story: the pressure behind the cap, the size of the pipe, the direction of the flow when the cap was eased. Martin listened and wrote nothing down, because this was Penn's measurement to make, not his, and because he had learned, in thirty-four years around water systems, when to hold the clipboard and when to let another man hold it.

From the trench they worked into Maple Ridge, junction box by junction box, street by street. At each box Penn lifted the lid, photographed the manifold, and counted the branch lines running off it, calling each number aloud while one of the crew wrote it on a tally sheet. At each street corner he stopped and checked the route against his plans, and where a branch ran to a house, he noted the address. The work was slow, methodical, and dull in the way honest measurement is dull, and Martin walked with them all day, answering questions when Penn asked them and otherwise staying out of the way. Neighbors watched from porches and driveways, some curious, some uneasy, and one or two came out to ask what was happening. Penn answered each of them the same way: that the county was tracing and metering a water main, and that he would have a written report when the work was done, and that until then he had nothing to announce. Martin said nothing at all, and was glad of Penn's even manner, because a crowd gathers fast around a dispute, and a calm voice keeps it from becoming something else.

By late afternoon the tally sheets were full, and Penn stood at the last junction box with his clipboard in his hands and added the numbers in pencil, twice, the way a man adds numbers when he knows they will be read aloud in a meeting. He called Martin over. He said the main line from Martin's well ran through the subdivision in a single system, with branches to house after house, and that the count of connected homes was one hundred and eighty. He said it plainly, without emphasis, the way an inspector says a number he has verified: 180 homes connected to Martin's well. Martin stood still for a moment, hearing the number settle. He had expected a large number. He had not expected one hundred and eighty. One hundred and eighty homes, drawing water through his pump, through the winter, while his bills climbed and his pump ran at night and Frances Bell stood in a meeting room and called him a thief for stealing water from the association.

Penn went on. He said the flow measurements matched the count, and that the well had been carrying the subdivision's demand, or a large part of it, for a long time, and that the wear on Martin's pump and the winter's power bills now had a plain explanation. He said the next step was his written report, and that the report would set out the chain in order: the well and its permit, the flagged route, the metered flow, the counted connections, and the records he would pull from the county archive. He said he would also note, in the report, that the cut on Tuesday morning in March had been made on a written order with no recorded documents and no county sign-off attached to it, because that was a fact of the case and it belonged in the file. Martin thanked him, and meant it, and shook his hand, and the crew packed the meter back into its case and loaded the truck.