I found old photographs of the bridge from the 1970s and 1980s. One showed my grandfather standing beside the original timber railing, holding a fishing rod. Another showed my father teaching me to repair a loose board when I was seventeen.
I located invoices for the most recent reconstruction, receipts for replacement fasteners, and copies of the independent inspection reports.
I also found a notebook in which I had recorded maintenance work over the previous decade.
The entries were ordinary.
Replace two boards on the eastern walkway.
Inspect the northern support after spring ice.
Retighten railing fasteners.
Apply protective treatment to exposed timber.
Nothing dramatic.
But together, the records established that the bridge had been maintained rather than abandoned.
I also retrieved the family documents relating to the reservoir.
The original 1928 agreement was stored in a protective sleeve. Its pages had yellowed, but the signatures and recorded references remained legible.
I spread the documents across the dining table.
My great-grandfather's handwriting appeared in several of the early drafts. He had made notes in the margins, correcting a boundary description and requesting clarification about the location of the emergency access corridor.
He had been meticulous.
The final agreement contained provisions for access, inspection, emergency coordination, and the protection of retained property when reservoir conditions created a risk to its structural integrity.
It did not grant the Hastings family ownership of the dam.
It did not authorize me to drain the lake at will.
It did, however, establish that the emergency structures and access corridor could not be treated as though they were entirely detached from the land my family retained.
I called Eleanor and asked her to review the agreement again.
"I want to understand every part of this before Covington decides to involve the reservoir."
"That's sensible," she replied.
"Do you think he might?"
"I don't know. But if the association has already attempted to challenge your bridge, it is worth understanding every relevant property right and every limitation on it."
We scheduled a meeting for the following week.
Before then, the association filed its first formal complaint.
The document alleged that my bridge had interfered with navigable access and that the collision had exposed a longstanding safety concern. It requested an administrative review of the structure and asked the relevant authority to prevent reconstruction until the review was complete.
Eleanor obtained a copy.
She was not surprised.
"They are trying to convert a private dispute into a regulatory matter," she explained. "That doesn't mean the regulator will agree with them. It means we need to provide the complete record."
She prepared a response that included the property survey, the inspection reports, historical photographs, and a concise account of the collision.
We submitted the footage through the appropriate channel.
We also requested an independent review of the channel's navigational characteristics, including the bridge's clearance, the available turning space, and the safe operating limits for vessels of different sizes.
I wanted the facts established by people who had no interest in the outcome.
If the bridge was unsafe, I needed to know.
If it was safe but unsuitable for a forty-two-foot yacht, that was a different problem.
And if Richard had deliberately attempted to force his vessel through a passage that could not accommodate it, the evidence should speak for itself.
The preliminary review did not take long.
A navigation specialist inspected the site, examined the photographs, and reviewed the available measurements. His report concluded that the bridge's clearance was limited but clearly visible, that the channel provided an opportunity for larger vessels to turn around before reaching the structure, and that the suitability of a vessel for the passage depended on its dimensions and maneuverability.
He did not make a finding about Richard's intent.
That was outside his role.
But he found no basis for claiming that the bridge had suddenly appeared as an unexpected obstacle.
Eleanor sent the report to the association's attorney.
The response was immediate.
Richard requested a meeting.
This time, I refused.
Eleanor sent a short letter explaining that any further discussion should occur through counsel and that all parties should preserve evidence relating to the collision.
For several days, there was silence.
Then the deputy's preliminary incident report became available.
It did not resolve every question, but it documented the collision, identified the yacht, recorded the visible damage, and noted that video evidence had been submitted for review.
The report did not establish that I had committed an offense or that the bridge had been unlawfully maintained.
It also did not absolve Richard of responsibility.
That was enough for the moment.