The old warehouse had changed owners again. During renovation, workers had found a locked metal cabinet behind a temporary wall in an office previously used for county archive storage. The cabinet bore a municipal asset sticker matching the missing transfer manifest. The new owner had reported it to the county rather than disposing of it. Bea obtained a documented transfer and arranged for the cabinet to be opened in the presence of the records supervisor and an independent observer.
Inside were two boxes of paper records, an obsolete hard drive, and a sealed envelope marked LARCH RUN REVIEW / SUPPORTING MATERIAL. The papers had suffered minor water damage. The hard drive's condition was unknown. The county placed the materials under preservation and notified investigators. Nobody treated the discovery as a license to announce the answer before the documents had been examined.
Mina was invited to review engineering items within the new collection. An archivist photographed the boxes, logged their contents, and separated the materials by relevance. Among them was the missing Annex D. It was not a dramatic confession. It was a technical report written by a consulting engineer three months after the flood, with a cover letter asking the county to clarify who had approved temporary openings during weather alarms.
The report described the warning station's final sequence. It confirmed that the sensor had issued a closure recommendation before the freight request. It also included the minutes of a conference call between the vendor office, the county traffic desk, and the freight contractor. At six thirty-nine, the freight contractor asked for a short access window to retrieve equipment from a site beyond the creek. The vendor representative said the opening could be scheduled if the county authorized it. At six forty-two, the traffic supervisor approved a conditional opening for authorized vehicles only.
The critical detail appeared in the next line. The conditions were supposed to include a requirement that a field worker verify the crossing before any public instruction changed. The software's interface did not distinguish authorized freight access from general public access. The consultant's report had warned that an opening intended for one vehicle category had been published as a general green signal.
Mina read the sentence twice. She had suspected the flaw; now a contemporary engineer had documented it before the county declared the flood an unforeseeable communication failure. The report did not prove that anyone wanted the bus to enter a flooded road. It showed that the county and vendor had been told exactly how a conditional opening could become a public misinstruction.
The sealed envelope contained correspondence from Dobbins to Captain Rell. Dobbins complained that the vendor interface had changed the public sign when he intended only to authorize the freight operator's passage after field verification. He said he had not received confirmation that a worker reached the bridge. Rell replied that the demonstration system was being reviewed and advised Dobbins to direct further comments through the county's legal office.
A handwritten note on Dobbins's copy said: Asked to explain in person. No meeting scheduled.
The final pages of the archive showed that the county's earlier review team had received the consultant's report but excluded it from the published summary because they considered the conditional opening a noncausal background event. The decision was recorded in a meeting memorandum bearing the signatures of Pike's predecessor, a county legal adviser, and two technical representatives. Pike's own signature was on the final summary, but not on the exclusion memorandum. That distinction mattered. She had approved a document whose underlying record was incomplete, but the recovered papers did not prove she personally directed the omission.
When Mina presented the new findings to the oversight committee, she explained both sides. Dobbins had authorized a limited freight movement despite a sensor warning, an action that required scrutiny. Crossfield's interface then published the instruction too broadly. The county's review failed to preserve that distinction for the public. No one decision explained every consequence of the flood, but the sequence made each decision visible.
The committee asked whether Dobbins could still be interviewed. Mina replied that investigators had spoken with him in Florida, with medical and legal accommodations appropriate to his condition. He remembered requesting field confirmation but could not reliably reconstruct the entire call. His account was consistent with some records and uncertain in others. The recovered memorandum and logs carried more weight than his recollection alone.
"Will he face charges?" a member asked.
"That question is for the appropriate prosecutors," Mina said. "My technical conclusion is that the authorization process failed to keep a limited exception from becoming a general safety instruction."
The oversight committee issued a supplemental report. It found that the earlier county review had omitted material information and recommended that the full corrected history be maintained in the public archive, with privacy protections where required. It also recommended that any future emergency exception be designed so that a conditional permission could not automatically change a general road safety display.