The company also agreed to suspend direct requests for access while the historical ownership review continued.
That was a meaningful development.
But it did not resolve the underlying issue.
Thomas Reed continued searching for the original transfer documents.
He located a reference to an archive held by a regional telecommunications company.
The archive was stored in a warehouse outside the city.
It contained old engineering plans, property agreements, and corporate transfer records.
Some documents had been digitized.
Others remained in paper files.
Thomas arranged an appointment.
Naomi asked whether I wanted to attend.
I said yes.
I wanted to understand what my father had been trying to protect.
The archive was colder than I expected.
The building was a converted industrial warehouse with long rows of shelving.
A staff member led us to a reading room.
Thomas had requested several boxes.
They arrived on a metal cart.
The first contained construction plans.
The second contained payroll records.
The third contained corporate correspondence.
The fourth was labeled:
NORTH EASTERN TELEGRAPH COMPANY — PROPERTY TRANSFERS.
I stared at the label.
This was the document set we needed.
Thomas opened the first folder.
There were dozens of pages.
Some were typed.
Others were handwritten.
Several contained maps.
We worked through them slowly.
The original installation agreement was dated 1953.
It described the communications network and identified the properties crossed by the route.
The company had obtained permission from several landowners.
But not all.
For some properties, the agreement included a recorded easement.
For others, it described a temporary construction license.
For three parcels, there was no clear documentation.
My property was one of the three.
Naomi leaned closer.
"Does that mean the original company never obtained permission?"
Thomas examined the page.
"Not necessarily. There may be separate agreements."
He turned another page.
A note appeared in the margin.
"Owner consent pending — rear parcel."
I looked at him.
"Which owner?"
Thomas checked the property number.
He compared it with the old map.
"Samuel Harlan."
I felt my pulse quicken.
"So he never signed?"
"Not according to this file."
Naomi examined the record.
"Could he have signed later?"
"Possibly. We need the subsequent correspondence."
Thomas opened another folder.
There were several letters.
One was addressed to Samuel Harlan.
It requested permission to complete the underground installation.
The letter explained that the route would be used for private communications services.
It offered a small annual payment.
Harlan's reply was attached.
He had refused.
His handwriting was unmistakable.
"I do not authorize the proposed route across my property. The existing line may remain in place as a historical installation, but no additional cable or equipment may be installed without a separate written agreement."
I read the letter twice.
That was important.
Harlan had not merely refused a new installation.
He had explicitly limited the use of the existing line.
He had allowed it to remain in place.
But he had not granted permission for additional equipment.
Thomas continued.
"There is another letter."
It was dated six months later.
The company acknowledged Harlan's refusal.
It stated that the planned extension would be redirected through the adjoining industrial parcel.
Naomi looked up.
"Then the route across Harlan's property was never approved for expansion."
Thomas nodded.
"That's what the correspondence indicates."
I leaned back.
"Does that mean North Valley had no right to install the new cable?"
"Based on these records, there is no evidence of permission."
Naomi examined the page.
"That's significant."
Thomas opened the transfer folder.
The next documents described the company's sale of its regional assets.
The original conduit was listed as an existing installation.
But the transfer schedule included a qualification.
"Assets transferred subject to existing property restrictions and uncompleted access agreements."
I looked at Naomi.
"What does that mean?"
"It means the successor company may have acquired the physical infrastructure, but it also acquired the restrictions attached to it."
"Which would include Harlan's refusal."
"Yes."
Thomas turned another page.
A later corporate transfer contained the same language.
The restrictions had followed the asset.
Then came the final transfer document.
It was dated thirty years later.
The network was transferred to a regional infrastructure trust.
But the property schedule did not include my parcel as an authorized access point.
Instead, it listed the conduit as a legacy asset with restricted use.
I stared at the document.
"Who owns it now?"
Thomas checked the final page.
"The trust was dissolved. Its remaining assets were transferred to a successor company."
"Which one?"
He read the name.
It was the same corporation that had recently entered a preliminary agreement with Westbridge.
I looked at Naomi.
"So Westbridge may be working with the current owner of the physical conduit."
"Possibly."
"But that doesn't give them access to my property."
"Correct."
Thomas pointed to another clause.
"The successor company also accepted the restrictions."
Naomi nodded.
"That's important. Any rights transferred would remain subject to the original limitations."