But Michael did not mistake a polite conversation for proof that every problem had been resolved.
He recorded the date and a brief summary of what had been discussed.
Then he returned to his work.
The next development came from an unexpected source.
Helen Price called on a Thursday afternoon.
She was the daughter of Samuel Harlan and had provided the historical letters that helped establish the original property restrictions.
Her voice sounded unusually hesitant.
"Michael, I hope I'm not interrupting."
"Not at all."
"I've been sorting through my father's remaining papers. I found something that might interest you."
"What is it?"
"A letter from your father."
Michael straightened.
"Arthur?"
"Yes. It was filed with my father's correspondence, not with the engineering documents."
"Do you know when it was written?"
"1984."
Michael waited.
Helen continued.
"It concerns the old communications system. My father apparently asked Arthur to inspect the boundary after the access chamber was sealed."
"Did he?"
"Yes. But the letter suggests they found something unexpected."
Michael looked toward the desk where he kept the scanned archive.
"What did they find?"
Helen took a breath.
"A second marker."
Helen sent a scanned copy that evening.
The letter was short, written on plain paper, and addressed to Samuel Harlan.
Arthur explained that he had visited the western boundary with Harlan and discovered a metal survey marker several feet from the location shown on the official drawing.
The marker did not indicate the conduit itself.
It identified a reference point used during the original survey.
Arthur wrote that the marker appeared to have been moved.
He recommended that the county surveyor verify its position before any future work was authorized.
At the bottom of the page, he had added a handwritten sentence.
The line on the map is not the line on the ground. Until the difference is explained, nobody should treat the drawing as permission to enter.
Michael read the sentence several times.
It sounded exactly like his father.
Tyler came into the room.
"What is it?"
Michael handed him the letter.
Tyler read it.
"So the boundary marker might have been moved?"
"That's what your grandfather suspected."
"Could that explain the different maps?"
"Possibly."
Michael called Naomi.
She answered after two rings.
"Michael?"
"We found another letter."
He explained the contents.
Naomi listened without interrupting.
When he finished, she said, "Send it to me. Don't contact Westbridge about it yet."
"Why?"
"Because I want to compare the letter with the survey records. If the marker was moved, we need to determine whether the county recorded a correction."
"Could someone have moved it deliberately?"
"Could have. But we don't know that. The marker might have been disturbed during unrelated construction, or the original survey may have been inaccurate."
Michael looked at the letter.
"My father thought it mattered."
"Then we'll find out why."
Naomi's review uncovered another inconsistency.
The county survey database contained a correction filed in 1985, one year after Arthur's letter.
The correction adjusted the western boundary reference by several feet.
But the correction was not reflected in every subsequent engineering drawing.
Some maps used the revised survey.
Others continued to rely on the original reference.
The difference was small enough to escape casual notice, but large enough to affect the location of the disputed access point.
The county engineer confirmed that the marker had likely been disturbed during construction of a drainage channel.
There was no evidence that anyone had deliberately moved it to create access rights.
That was important.
It meant the discrepancy could be explained without assuming a conspiracy.
However, the engineer also confirmed that Westbridge's current application relied on a map that predated the correction.
Naomi sent a formal request for the application to be amended.
This time, Westbridge agreed.
The revised plan removed the disputed access point from Michael's parcel and identified the 1996 maintenance location as the preferred route.
It also acknowledged that the historical access rights remained subject to the original restrictions.
Michael read the revised language carefully.
It did not erase the months of trouble.
It did not undo the destruction of the greenhouse.
But it corrected the record.
And that mattered.
In early spring, the county issued its final technical memorandum.
The document was less dramatic than the earlier property decision. It contained no sweeping declaration and no accusation of wrongdoing.
It simply identified the known sections of the communications conduit, the documented access points, and the historical restrictions governing entry.
The memorandum stated that:
-
The original western access chamber had been decommissioned and sealed.
-
A later maintenance point had been established outside Michael Bennett's parcel.
-
The disputed access location shown in Westbridge's earlier application was not supported by a completed construction record.
-
The engineering drawings had relied on an outdated survey reference.
-
No blanket access right across Michael's property had been established.
-
Any future work requiring entry onto the parcel would require a separately documented legal basis and appropriate authorization.