The board hired Thomas Avery's firm to develop the corrective design.
Meredith Shaw reviewed the relevant technical information on our behalf.
The county participated within its regulatory role.
And the association's attorney began discussing a possible settlement with Laura.
For the first time, the conversation shifted away from whether the flooding was real.
It became a question of how to correct it.
That was progress.
But it also revealed how expensive the delay had become.
The original rehabilitation project might have cost a substantial amount when first recommended.
Now the costs were higher.
The old junction had deteriorated further.
The surrounding soil required stabilization.
Part of the new patio had to be removed.
The bypass line had created erosion that needed repair.
The stormwater facility required cleaning and structural work.
And the association faced potential liability for damage to our property.
The cheaper solution had become the expensive solution.
Exactly the outcome the original engineering warning had tried to prevent.
One afternoon, Laura called with an update.
"The association has proposed a settlement framework."
I was at a job site.
I stepped outside.
"What are they offering?"
"Correction of the drainage system, removal of the lawn-related fines, and a financial payment toward documented property damage."
"How much?"
She told me.
I was quiet.
It was far below the repair estimates.
"That's not enough."
"I agree it's inadequate based on the documentation we have."
"Then why offer it?"
"Because settlement negotiations usually begin with positions, not conclusions."
I leaned against the van.
"Are they admitting responsibility?"
"No."
"Of course not."
"Garrett, focus on the outcome."
I took a breath.
"Right."
She continued.
"The important development is that they're discussing a corrective project. We need to ensure the design actually protects your property and that any settlement addresses the full scope of damage."
"Can we require independent verification?"
"We can negotiate for appropriate inspection, performance standards, and documentation."
"Good."
I looked toward the gray sky.
"Laura?"
"Yes?"
"I don't want the water sent to somebody else's yard."
"I know."
"I mean it. I don't want them solving my problem by making it another homeowner's problem."
"That's why the design needs to follow the approved system and applicable requirements."
I nodded.
"Then that's what we do."
The corrective plan took shape over the following weeks.
The engineers proposed rehabilitating the original eastern drainage route.
The damaged junction would be replaced.
The connecting pipes would be inspected and repaired as necessary.
The stormwater facility would be restored to its intended function.
The unauthorized bypass would be taken out of service after the approved system was ready to handle the design flow.
The eroded common-area slope would be stabilized.
And the discharge toward our property would be eliminated as a concentrated outfall.
It was not a simple project.
It required excavation near the clubhouse patio.
It required careful sequencing.
It required temporary stormwater controls during construction.
It required permits and inspections.
And it required money.
A great deal of money.
The board faced an unpleasant choice.
It could continue fighting while the damage accumulated and the compliance issues remained unresolved.
Or it could approve the repairs and explain to homeowners why the project had become so expensive.
Eleanor Pike supported the corrective plan.
Two other board members joined her.
Malcolm Voss abstained from one key vote after questions arose about his role in the original financing decisions.
Constance opposed the plan.
She argued that the association should continue pursuing legal defenses before committing to major construction.
But the votes were no longer hers to command.
The board approved the engineering design process.
Constance lost again.
Then she did something I hadn't expected.
She came to my house.
It was a Tuesday afternoon.
I had just finished replacing a faulty breaker at a nearby property and was unloading tools from my van when the pearl-white Escalade stopped at the curb.
Constance stepped out.
She wore a pale gray pantsuit and carried a leather folder.
For a moment, I wondered whether she had come to deliver another violation notice personally.
She approached the driveway.
"Mr. Hollenbeck."
"Mrs. Drewry."
"May we speak?"
I set down my toolbox.
"About what?"
"The ongoing drainage matter."
I glanced toward the house.
Denise was at work.
"Your attorney can contact mine."
Constance's expression tightened.
"I was hoping we might speak as neighbors."
That almost made me laugh.
For three years, she had refused to speak to me as a neighbor.