Measurements were recorded.
Temporary supports were installed where necessary.
Walter stood beside me.
"Well," he said.
I looked at him.
"What?"
"That's one ugly hole."
I laughed.
"Technical assessment?"
"Seventy-two years of experience."
We watched the crew work.
For years, the problem had been hidden.
Buried beneath landscaping.
Covered by patio stones.
Explained away through letters.
Now it was exposed in daylight.
The damaged structure.
The failed connection.
The voids in the surrounding soil.
There was no way to make it disappear with a newsletter.
The repairs took longer than expected.
The contractor discovered additional deterioration in a connecting pipe.
A section of the original drainage line required replacement.
The stormwater basin needed more sediment removal than the initial estimate anticipated.
There were delays for materials and inspections.
But the work continued.
Each week, the new board published an update.
Each week, I reviewed the progress with Meredith and Laura.
And each week, the possibility of a dry backyard became more real.
Then, near the end of July, the engineers prepared for the first controlled flow test.
The new junction had been installed.
The eastern conveyance route had been rehabilitated.
The stormwater facility had been cleaned and repaired.
Temporary controls remained in place.
The bypass was still connected, but the contractor had established a supervised sequence for transferring flow to the restored system.
The test would use controlled water volumes and monitoring equipment to verify the route before the final configuration was placed into service.
I was invited to observe from a designated area.
Denise came with me.
So did Walter.
Eleanor Pike stood near the construction manager.
David Kessler attended in his official capacity.
Meredith Shaw was there as our consulting engineer.
The atmosphere was serious.
Nobody treated it like a celebration.
There were checklists.
Radios.
Flow measurements.
Inspection points.
The engineers wanted to confirm that the rehabilitated system could carry water as designed without leakage, unexpected surcharge, or downstream problems.
I watched the contractor prepare the test.
Then I looked toward the clubhouse.
The patio was still partly excavated.
The ground around the new junction was exposed.
Temporary barriers surrounded the work area.
For three years, water had been sent away from that location and toward my property.
Now, under engineering supervision, the flow would return to the route originally designed to carry it.
I felt Denise take my hand.
"You okay?"
I nodded.
"Yeah."
She looked toward the excavation.
"Feels strange."
"What does?"
"Standing here waiting for water to go somewhere it's supposed to go."
I smiled.
"That's a pretty good description."
The test began.
Water entered the restored conveyance system.
The engineers monitored the junction.
The downstream structures were checked.
The flow moved east.
Away from our property.
Toward the stormwater facility.
For several minutes, everything appeared normal.
Then one of the technicians spoke into his radio.
"Hold the flow."
The pump operator stopped.
The engineers moved toward the junction.
I felt my stomach tighten.
Meredith looked at the monitoring data.
David joined the construction manager.
They spoke quietly.
Then the contractor inspected a connection near the clubhouse side of the excavation.
A small amount of water had appeared where it wasn't expected.
Not a catastrophic failure.
Not a dramatic flood.
But enough to indicate that something remained wrong.
The engineers halted the test.
The area was secured.
Further inspection was ordered.
I looked at Denise.
Her expression fell.
"Not again."
I squeezed her hand.
"We're closer."
She looked at the excavation.
"How much closer?"
I didn't know.
That afternoon, Laura called.
"The test identified an additional connection issue."
"I saw."
"The contractor is investigating."
"Does it change the plan?"
"Not necessarily. But the system can't be placed into full service until the problem is corrected."
I rubbed my forehead.
"Another delay."
"Yes."
I looked toward the backyard.
The grass was dry that afternoon.
For once, it almost looked normal.
But I knew the next heavy storm could bring the water back.
Laura continued.
"Garrett, I know you're tired."
I laughed without humor.
"That's an understatement."
"But this is why the work has to be done properly. We don't want the association transferring full flow into a system that hasn't passed inspection."
"I know."
"And neither do you."
"No."
She paused.
"There's something else."
I straightened.
"What?"
"The contractor believes the unexpected leakage may involve a previously undocumented connection beneath the clubhouse service area."
I frowned.
"Undocumented?"
"That's what they're investigating."
I looked toward the clubhouse roof beyond the trees.